Rotating iron, switchgear, transformers and power electronics assembled, tested and commissioned indoors before they ever see a site, then delivered beside the compute they power.
A microgrid as a product.
HYPERCUBE compute, battery storage and power conversion delivered as a single engineered estate: generation, storage and distribution standing shoulder to shoulder with the compute they power.
Switchgear, conversion and controls are integrated as products, not one off projects.
THE POWER LINE
Assembled under crane, proven under load.
Every unit earns its rating indoors, witnessed and recorded, before the yard and long before a customer site.
01
The generator hall
Industrial generators and alternators assembled under crane in their own hall.
02
Containerised generation
Generator sets integrated into containerised modules under the same enclosure discipline as the compute.
03
Load bank acceptance
Every generator earns its rating against load banks before it ships: factory acceptance, witnessed and recorded.
04
Switchgear and power electronics
Conversion, protection and control cabinets are built and tested as a product line of their own.
05
Transformer commissioning
Transformers and substation equipment are commissioned indoors, on test pads, before they ever see a site.
06
Energy control
A dedicated room treats power like a portfolio: monitored, balanced and reported in real time, with every electron on campus mirrored on screen.
STATUS
Planned capability.
The power lines are part of the planned Dubai campus. Ratings, capacities and certifications are released only after qualification and factory acceptance, and are stated as engineering targets until then.
THE OTHER HALLS
One campus. Eight families.
Eight halls. One campus.
Everything DXQ builds is made in one planned campus in Dubai. Each hall builds one family.